The first pick-up at the inauguration of the drilling works on the Suez Canal on 25 April 1859. The construction site in Egypt intended to connect the Red Sea to the Mediterranean Sea lasted until 1869(The first pick-up at the inauguration of the drilling works on the Suez Canal on 25 April 1859 The construction site in Egypt intended to connect the Red Sea to the Mediterranean Sea lasted until 1869. Engraving of the 19th century Collection Particuliere)Anonymous Anonymous |
€ 140.86
Enthält 13.5% MwSt.
|
Undated · Engraving
· Picture ID: 1069102
Private Collection / Bridgeman Images |
0 Reviews |