support@meisterdrucke.com  ·  0043 4257 29415

Deutsch English Italiano Español Français Nederlands Português Svenska Polski Dansk
Search by artist, work title or style – e.g. Monet, Starry Night, Impressionism, Hokusai wave, nude. Describe the scene – e.g. green meadow, abstract with lots of red, dark oil painting, standing nude next to a tree.

Stages and Methods of Laying Floors, from 'Della Architettura', published 1590 by Giovanni Antonio Rusconi

Stages and Methods of Laying Floors, from 'Della Architettura', published 1590

(Stages and methods of laying floors, from 'Della Architettura', published 1590 (see also 205051))


Giovanni Antonio Rusconi

€ 139.5
Includes 13.5% VAT
   Configure art print
Undated  ·  engraving  ·  Image ID: 183094

Nonclassified artists

Stages and Methods of Laying Floors, from 'Della Architettura', published 1590 by Giovanni Antonio Rusconi. Available as an art print on canvas, photo paper, watercolor board, natural paper, or Japanese paper.
in preparation since c 1533 · renaissance · method · technique · floor · architectural · diagram · cross section · workers · builders · working · Private Collection / Bridgeman Images
AR/3D   View in 3D / AR zu Favoriten hinzufügen   Add to favorites    Change wall color    View picture in a room
0 Reviews

Configure art print

Picture Frame

Medium & Stretcher

Glass & Passepartout

Miscellaneous & Extras

 Save / compare configuration
Preview Icon

Summary

Gemälde
Veredelung
Keilrahmen
Museumslizenz

€ 139.5
(inkl. 20% MwSt)
   Add to cart

Bildschärfe: PERFEKT

If you'd like us to adjust the brightness, colors, or crop the image, we're happy to do this for you at no extra cost. Just get in touch!

Similar artworks selected for you

Stages and methods of laying floors, from Laying Foundations Illustration from De re metallica libri XII by Georgius Agricola, 1556 Methods of Transporting Pre-Fabricated Roofs to the Site from Cosmographia, Fol 436-437 Page 742 from Historia De Gentivus Septentrionalibus by Magnus Olaus, Rome 1565 Stages and Methods of Floor Laying, from Silver mine of La Croix-aux-Mines, Lorraine, fol.13v and fol 14r, the red mine of St. Nicholas, c.1530 Study on perspective in painting - plate from the first book of the series “On Painting” by Leon Battista Alberti Illustration from the Four Books on Human Proportion, 1528 Silver mine of La Croix-aux-Mines, Lorraine, washing the ore, c.1530 Cosmographia, Fol 346-347, 1544 Ars magna lucis et umbrae, 1646 Page 57 of Water Movement Theater of Marcellus Boys races from Orbis Sensualium Pictus, 1658 Dante and Virgil with the Vision of Beatrice Nymphs with the Lover of Polia, illustration from a copy of Foetus, Illustration from Oeuvres by Ambroise Pare (1509-90) Published in Lyon, 1641 Plate C5v-C6r, from Cosmographia, Fol 437, 1544 Illustration from Le Liurse du Roy Modus et de la Reine Racio by Henri Ferrieres, 1486 Smelting iron furnace, pig iron mould, 1751-1777 How the Emperor of the Kingdom of Guiana Adorns His Nobles... (from book, Americae, parts seven and eight) Ms Hunter 242 f.258v and f.259r, from Christ Crowned with Thorns Christ Crowned with Thorns The Mount of Olives, Jerusalem, from Itinerarium Hierosolymitanum, by J. Cotovico, 1619
Show more similar artworks

Similar artworks selected for you

Stages and methods of laying floors, from Laying Foundations Illustration from De re metallica libri XII by Georgius Agricola, 1556 Methods of Transporting Pre-Fabricated Roofs to the Site from Cosmographia, Fol 436-437 Page 742 from Historia De Gentivus Septentrionalibus by Magnus Olaus, Rome 1565 Stages and Methods of Floor Laying, from Silver mine of La Croix-aux-Mines, Lorraine, fol.13v and fol 14r, the red mine of St. Nicholas, c.1530 Study on perspective in painting - plate from the first book of the series “On Painting” by Leon Battista Alberti Illustration from the Four Books on Human Proportion, 1528 Silver mine of La Croix-aux-Mines, Lorraine, washing the ore, c.1530 Cosmographia, Fol 346-347, 1544 Ars magna lucis et umbrae, 1646 Page 57 of Water Movement Theater of Marcellus Boys races from Orbis Sensualium Pictus, 1658 Dante and Virgil with the Vision of Beatrice Nymphs with the Lover of Polia, illustration from a copy of Foetus, Illustration from Oeuvres by Ambroise Pare (1509-90) Published in Lyon, 1641 Plate C5v-C6r, from Cosmographia, Fol 437, 1544 Illustration from Le Liurse du Roy Modus et de la Reine Racio by Henri Ferrieres, 1486 Smelting iron furnace, pig iron mould, 1751-1777 How the Emperor of the Kingdom of Guiana Adorns His Nobles... (from book, Americae, parts seven and eight) Ms Hunter 242 f.258v and f.259r, from Christ Crowned with Thorns Christ Crowned with Thorns The Mount of Olives, Jerusalem, from Itinerarium Hierosolymitanum, by J. Cotovico, 1619
Show more similar artworks

More art prints by Giovanni Antonio Rusconi

Title Page of Stages and methods of laying floors, from Stages and Methods of Floor Laying, from Moving building material from the quarry onto ships, from Ideal Proportions Based on the Human Body, from Vernacular housing and brickmaking, from Methods of Transporting Pre-Fabricated Roofs to the Site from Le Trasformationi Development of Housing, from Applying a Protective Coating to a Wall, from Stages and Methods of Laying Floors, from Laying Foundations
Show more works by Giovanni Antonio Rusconi

More art prints by Giovanni Antonio Rusconi

Title Page of Stages and methods of laying floors, from Stages and Methods of Floor Laying, from Moving building material from the quarry onto ships, from Ideal Proportions Based on the Human Body, from Vernacular housing and brickmaking, from Methods of Transporting Pre-Fabricated Roofs to the Site from Le Trasformationi Development of Housing, from Applying a Protective Coating to a Wall, from Stages and Methods of Laying Floors, from Laying Foundations
Show more works by Giovanni Antonio Rusconi

A selection of our top sellers

The Attic Room Woman in a Yellow Dress Portrait of the Philosopher and Esotericist Rudolf Steiner Tiger in a Tropical Storm Breakfast with the Morning Newspaper, 1898 Lake Thun with Symmetrical Reflection Spring Woman with a Parasol The Bookworm Composition C; Composition No. III; Composition with Red, Yellow Lake Geneva with Mont Blanc in the Dawn Glow Blooming Cherry Tree Angel Traveller Knitting Girl, Watching a Toddler in the Cradle Faculty Painting Medicine
Show more artworks

A selection of our top sellers

The Attic Room Woman in a Yellow Dress Portrait of the Philosopher and Esotericist Rudolf Steiner Tiger in a Tropical Storm Breakfast with the Morning Newspaper, 1898 Lake Thun with Symmetrical Reflection Spring Woman with a Parasol The Bookworm Composition C; Composition No. III; Composition with Red, Yellow Lake Geneva with Mont Blanc in the Dawn Glow Blooming Cherry Tree Angel Traveller Knitting Girl, Watching a Toddler in the Cradle Faculty Painting Medicine
Show more artworks


What our customers think about us



Frequently Asked Questions about Meisterdrucke


Personalizing your art print at Meisterdrucke is simple and intuitive: Choose a frame, set the image size, pick a printing medium, and add suitable glazing or a stretcher frame. We also offer additional customization options like mats, fillets, and spacers. If you have any questions, our customer service team is ready to help you create your perfect artwork.

At Meisterdrucke, you can visualize your configured artwork directly in your own room. Simply upload a photo of your space and see how the artwork looks in it. If you're visiting us on a mobile device — phone or tablet — our augmented reality feature brings the picture to life and projects it right into your room. A unique experience that combines art and technology.

Choosing the right medium is often a matter of personal taste. To give you a better idea, we've provided some images for each medium. We also offer a sample set of all paper variants, so you can decide not just visually but by touch as well. You can order the sample set free of charge — only shipping costs apply.

Don't worry! At Meisterdrucke, we don't just process orders mechanically. Every order is manually reviewed by our team. If we spot any inconsistencies or issues with your configuration, we'll get in touch with you right away. And of course, our friendly and patient support team is always here to help you with your configuration. We'll work with you by phone or email to adjust your image so the final result is exactly what you had in mind.


Still have questions?

Are you interested in an art print from our manufactory but still unsure? Do you need advice on choosing the medium or help with the order?

Our experts are happy to assist you.

+43 4257 29415
support@meisterdrucke.com
Mo-Do: 7:00 - 16:00 | Fr: 7:00 - 13:00

Still have questions?

Are you interested in an art print from our manufactory but still unsure? Do you need advice on choosing the medium or help with the order?

Our experts are happy to assist you.

+43 4257 29415
support@meisterdrucke.com
Mo-Do: 7:00 - 16:00 | Fr: 7:00 - 13:00


Meisterdrucke

   Kärntner Strasse 46
        9586 Finkenstein am Faaker See
        Austria
        +43 4257 29415
        support@meisterdrucke.com
Other languages

                   
Erfahrungen & Bewertungen zu Meisterdrucke
Post.at DHL Express Quehenberger Cargoboard
Kaiser Franz Joseph

Meisterdrucke
Kärntner Strasse 46
9586 Finkenstein am Faaker See · Austria
+43 4257 29415 · support@meisterdrucke.com
Post.at DHL Express Quehenberger Cargoboard


               

(c) 2026 meisterdrucke.ie